Regulation 25A Reports, London and Nationwide

We write the high-efficiency alternative systems report every new building in England needs before work starts. Heat pumps, heat networks, CHP and renewables, checked against your design and written up for building control.
Illustration of new flats and houses with solar panels, a heat pump and pipes to a shared energy centre

Regulation 25A reports for new dwellings and commercial buildings

We provide Regulation 25A reports for new houses, flats and commercial buildings, in London and nationwide. Send us the drawings for a free quote. Turnaround is 5 working days once we have everything we need.

Regulation 25A of the Building Regulations 2010 says that before work on a new building starts, whoever is carrying out the work must analyse the technical, environmental and economic feasibility of high-efficiency alternative systems, and take the result into account in the design. The analysis has to be written down, and building control has to be told it's done.

What the regulation asks for

Checked against legislation.gov.uk and Approved Document L, 15 November 2026.

  • Systems to look at: decentralised energy supply based on renewables, cogeneration (CHP), district or block heating or cooling, and heat pumps.
  • When: before work starts. Building control must be told, no later than the start of the day before work starts, that the analysis has been done, documented and is available to check.
  • Higher-risk buildings: the notice goes in with the building control approval application.
  • Keep a copy: building control can ask to see it at any reasonable time.
  • Groups of buildings: one analysis can cover a group of similar buildings or common building types in the same area, or every building connected to the same heat network.

What it doesn't ask for

Regulation 25A doesn't make you fit any of these systems. Approved Document L says the regulations don't require high-efficiency or low and zero carbon systems to be installed. Building control wants to see that they were properly considered, and a clear statement of whether your design includes them.

In practice the SAP or SBEM result, and in London the planning conditions, usually decide the heating. The report shows the alternatives were weighed up first.

What we look at

For each system the regulation lists, we check three things: does it work on this site and this building (technical), what does it do to carbon and primary energy (environmental), and what does it cost to install and run (economic).

  • Heat pumps: air, ground or water source. Space for the units, noise, ground area, electrical supply and the effect on the SAP or SBEM.
  • Heat networks and block heating: whether there's a network nearby or planned, and whether a communal system suits the scheme. In London we start from the London Heat Map. See community heating feasibility.
  • CHP: whether the site's heat demand is big and steady enough for it.
  • Renewables: solar PV, solar thermal, biomass and wind. Roof area, orientation, shading, planning limits, fuel delivery and storage.

Options that pass the first check are run through your SAP or SBEM, so the carbon and energy figures come from the real calculation, not a guess.

What you get

  • A Regulation 25A report covering every system the regulation lists, with technical, environmental and economic feasibility for each.
  • SAP or SBEM results for the options worth testing.
  • A clear conclusion: which systems are in the design, and why the others aren't. That's the statement Approved Document L asks for.
  • Wording for the notice to building control before work starts.
  • One report for a group of similar homes or a whole phase, where the regulation allows it.

Who needs one

Anyone putting up a new building in England: houses, flats, mixed-use and commercial buildings. Order it with the SAP calculations or SBEM, or bring us in at design stage so it's ready well before the start date.

Regulation 25A doesn't apply to extensions. For a major renovation, Approved Document L says the feasibility of these systems should still be considered.

How it fits with the SAP, SBEM and energy statement

The SAP or SBEM shows whether the design meets Part L. The Regulation 25A report shows the alternatives were looked at before the heating was chosen. We do both in-house, so the options are tested in the actual calculation.

In London, the energy statement for planning already reviews heating options and renewables under the energy hierarchy. We use the same review for the Regulation 25A report, so the two documents agree.

The March 2027 changes

The new Approved Document L (2026 edition) applies to building work from 24 March 2027 (24 September 2027 for higher-risk buildings). It drops the separate Regulation 25A section and says the analysis done to meet the target primary energy rate counts as the analysis Regulation 25A needs.

The regulation itself stays in force in England, so the notice to building control before work starts still applies. Schemes that keep the old rules (application in before 24 March 2027 and work started before 24 March 2028) follow the 2021 guidance. See Future Homes Standard and the Home Energy Model.

In Wales, Regulation 25A is revoked from 4 March 2027, with transitional arrangements for work already under way.

Checked 15 November 2026.

What we need from you

  • Site plan, floor plans, elevations and sections.
  • The proposed heating, hot water and ventilation, if you have them.
  • Number and type of units, and any phasing.
  • The SAP or SBEM if someone else did it. If not, we can do it.
  • Any planning conditions or energy statement for the site.

Don't have a heating spec yet? That's the right time to do this report. Send what you have.

Price and turnaround

Send us the details for a free quote.

Turnaround: 5 working days once we have everything we need. Need the SAP, SBEM or energy statement too? We can price them together.

Our experience

More than 17 years in energy assessment, with more than 4,000 SAP calculations, 2,000 commercial EPCs and 50 energy statements behind us. A mechanical engineering background means heating and plant options are what we know best. One team for the Regulation 25A report, the SAP or SBEM and the energy statement. See our case studies.

Questions we get asked

What is a Regulation 25A report? It's the written analysis Regulation 25A of the Building Regulations asks for on a new building. It looks at heat pumps, heat networks, CHP and renewables, says whether each is feasible, and states whether the design includes them.

When does the Regulation 25A analysis have to be done? Before work starts. Building control must be told it's done and documented no later than the start of the day before work starts. On higher-risk buildings the notice goes in with the building control application.

Do I have to install a heat pump if the report says it's feasible? Not because of Regulation 25A. It asks you to consider the systems and take the result into account, not to fit them. Part L targets or planning conditions may still push you that way.

Can one report cover a whole development? Yes. One analysis can cover a group of similar buildings or common building types in the same area, or every building on the same heat network.

Does Regulation 25A apply to extensions? No. It covers new buildings only. For a major renovation, Approved Document L says these systems should still be considered.

Does Regulation 25A still apply after March 2027? In England, yes: the regulation stays, and the new guidance links the analysis to the target primary energy rate. In Wales it's revoked from 4 March 2027.

Related: SAP calculations and EPCs, SBEM and BRUKL, Energy statements, Community heating feasibility reports, Solar PV in SAP and SBEM, Future Homes Standard and the Home Energy Model, New Dwellings, Commercial services.

Email your drawings or WhatsApp us for a free quote.

Illustration of four options compared in a Regulation 25A report: air source heat pump, ground source heat pump, solar panels and combined heat and power

Send Us Your Drawings

Email or WhatsApp your drawings and the heating spec if you have it, and we will come back with a free quote for your Regulation 25A report.