Short videos from our energy assessors on SAP, Part O overheating and TM44 inspections. Newest first.
Videos
Short videos from our energy assessors on SAP calculations, Part O overheating and TM44 inspections: what goes wrong on real projects and how to avoid it. Newest first. We add new videos from our YouTube, Facebook and Instagram channels every week.
Follow us on YouTube, Facebook and Instagram.
November 2026: Part G Water Calculations: Converting a House Into Flats
When a house is converted into flats, each new flat needs its own Part G water calculation. We explain why choosing the taps, showers, toilets and baths before you order makes the target much easier to meet. Related: Part G water efficiency calculations. Watch on YouTube.
November 2026: MEES Exemption Commercial: It Expires After 5 Years
A MEES exemption on a commercial building does not last for ever, and a new landlord cannot rely on the old one. We explain why it pays to plan the upgrades before the exemption runs out. Related: EPC B for commercial property. Watch on YouTube.
November 2026: TM44 Inspection London: 127 kW Warehouse in Park Royal
A recent TM44 inspection of a document storage warehouse in Park Royal, with air conditioning ranging from split units in the offices to close control units in the storage vaults. Related: TM44 air conditioning inspections. Watch on YouTube.
November 2026: MEES Commercial Property: EPC B by 2031 Explained
Our longer video on the MEES rules for rented commercial property: what is changing, how the rating works, the penalties, exemptions and which upgrades move the rating. General guidance, not legal advice. Related: MEES: letting an F or G rated building. Watch on YouTube.
November 2026: Energy Statement London: What We Need From You
What we need to start an energy statement for planning: the drawings, the specification and the heating strategy, so your energy statement and your SAP or SBEM use the same numbers from day one. Related: energy statements for planning. Watch on YouTube.
November 2026: Display Energy Certificate Requirements: Who Needs a DEC?
Which buildings need a Display Energy Certificate, from schools and council offices to libraries and leisure centres, and why it has to be on show where the public can see it. Related: display energy certificates. Watch on YouTube.
November 2026: TM59 Overheating Assessment London: Two Bedroom Tests
Every bedroom in a TM59 overheating assessment faces two tests, one for warm hours and one for hot nights. We show how shading, glazing and night-time ventilation can help rooms pass. Related: TM59 overheating assessments. Watch on YouTube.
November 2026: Design Stage SAP Calculation: Default Junctions Cost You
Default junction values are deliberately cautious, so they can stop a design stage SAP calculation passing. Values for your real lintels, sills and eaves can help it pass without a costlier specification. Related: PSI value calculations. Watch on YouTube.
November 2026: SAP Calculations: A B Rating Isn't a Part L Pass
A good EPC band does not mean a new build passes Part L. We explain the three targets building control checks, and why a heat pump cannot make up for weak walls, roofs or junctions. Related: SAP calculations for new builds. Watch on YouTube.
October 2026: Mould in the Corner? Thermal Bridging in New Extensions
Mould in the corner of a new extension is often caused by a cold junction rather than poor ventilation. Where the insulation stops short, the inside corner gets cold enough for condensation, so we check junction details at design stage for both the SAP calculation and the surface temperature. Related: condensation risk analysis. Watch on YouTube.
October 2026: New Build SAP Calculations: Party Wall Junctions Explained
On terraces and flats, heat escapes where the party wall meets the outside wall, and that same detail repeats in every home on the scheme. Keeping the insulation continuous with a cavity closer at design stage helps every unit's SAP calculation. Related: psi-value calculations. Watch on YouTube.
October 2026: TM59 Overheating Assessment: Why Cooling Comes Last
Part O expects passive measures before mechanical cooling, so in a TM59 dynamic model we test glazing, shading, opening sizes and ventilation first. We only look at cooling when those are not enough. Related: TM59 overheating assessments. Watch on YouTube.
October 2026: New Build SAP Calculations: Why Junctions Cost You
New build SAP calculations often struggle because of heat lost at the junctions, not through the walls themselves. Insulation that stops short at the eaves and steel lintels over windows are two common culprits, and both are far easier to sort at design stage. Related: psi-value calculations. Watch on YouTube.
October 2026: Part O: when the simplified method is ruled out
The simplified Part O method is the quickest route, but it cannot always be used. If the site is in a high-risk location, mainly central London, or noise means bedroom windows have to stay shut at night, we need a TM59 dynamic model instead, so check the postcode and noise report early. Related: Part O simplified or TM59?. Watch on YouTube.
October 2026: Over 12 kW of air con? Your TM44 inspection explained
If the air conditioning in a building adds up to more than 12 kW, it needs a TM44 inspection, so count every unit, not just the biggest one. We explain how often the inspection is due and how the report is lodged on the national register. Related: TM44: who needs one. Watch on YouTube.
October 2026: Your SAP isn't finished at design stage: design vs as-built
A design-stage SAP is only half the job: at completion we update it to what was actually built, add the air test result and produce the on-construction EPC. Take site photos of insulation, junctions and services before they are covered up, as Part L now asks for them. Related: SAP calculations. Watch on YouTube.
October 2026: 3 reasons new homes fail Part O (and how to fix them)
Too much glass on one side, no cross-ventilation, and bedroom windows that can't stay open at night because of noise. Related: our full guide and Part O overheating assessments. Watch on YouTube.
Got a question we haven't covered?
We have more than 17 years of experience and have completed more than 8,500 assessments. Send us your drawings and we'll tell you what your scheme needs, with a free quote and a turnaround time.
Email your drawings or WhatsApp us for a free quote.
Send Us Your Drawings
Have a similar project? Send us your drawings and we will come back with a price and a turnaround time.