MEES and the 2031 EPC B target

Get Your Commercial Property to EPC B by 2031

EPC B by 2031 is the government's policy for rented commercial property over 1,000 m² in England and Wales. It isn't law yet; it needs new regulations first. We're MEES consultants based in London, working nationwide. We model the lowest-cost route from EPC D or E to B and set it out in a costed EPC B upgrade plan.
Illustration of a commercial building with its energy rating moving from E to B

Our EPC B upgrade plan for commercial property

Reaching EPC B takes more than a new certificate. You need to know what the law requires, which upgrades will work, what they cost and whether they pay back. With more than 17 years' experience in energy assessment, we give you all of that in one report.

What you get

  1. Existing building calculation. We survey the property and build an energy model of the building as it stands today. This confirms the true current rating and shows where the energy is lost.
  2. Proposed calculation. We produce a second model with the upgrades we recommend, showing the rating the building will achieve once they are installed.
  3. Cost breakdown. Each recommended improvement is itemised with an indicative cost, so you can see what every step towards B will require.
  4. Payback period. We calculate how long each measure takes to pay for itself through energy savings. Where works would not pay back within seven years, we prepare the evidence for an exemption.
  5. Council and Building Regulations review. We check the proposals against your local council's planning requirements and the Building Regulations before you commit to any works.

Turnaround: 5 working days once we have everything we need.

MEES for commercial property: our advice

Short answer: if you let a commercial building in England or Wales, it needs EPC E or better today. If it's over 1,000 m², plan for EPC B by 2031.

MEES stands for the Minimum Energy Efficiency Standards, set by the Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015.

The rules today (law now)

  • MEES applies to privately rented commercial property that legally needs an EPC.
  • The minimum is EPC E. Below that you can't let the building, renew or extend the lease, or carry on letting it, unless a valid exemption is registered.
  • New lets and renewals have been covered since 1 April 2018, and every existing lease since 1 April 2023.
  • It doesn't cover leases of 6 months or less (with some exceptions), leases of 99 years or more, or buildings that don't need an EPC.
  • An EPC lasts 10 years and is needed when a building is sold, let or built.

EPC B by 2031 (it was 2030): what's coming

This is government policy, not law yet.

  • Over 1,000 m²: EPC B by 2031, where cost-effective (interim response, 18 June 2026).
  • Under 1,000 m²: stays at EPC E, with no date set for a higher standard.
  • 2027 EPC C step: dropped.
  • 7-year payback test: stays, along with the existing exemptions.
  • November 2026: the government's Energy Independence Bill factsheet confirms the 2031 EPC B plan and sets out tougher enforcement: inspection powers, a national compliance database and more bodies able to enforce. The EPC B standard itself still needs new regulations.
  • Still to be decided: how the 1,000 m² is measured, shell-and-core lets, tenant duties and penalty levels.

If you've read about EPC B by 2030 for commercial property: that was the earlier proposal, with EPC C by 2027 on the way. The government has moved the date to 2031 and dropped the 2027 step.

MEES exemptions for commercial property

If the building can't reach the minimum at a sensible cost, you register an exemption on the PRS Exemptions Register. It only counts once it's registered, and it may not pass to a new owner.

  • 7-year payback: three quotes and our payback calculations showing the works won't pay back in 7 years. Lasts 5 years.
  • All relevant improvements made: evidence the works are done and the rating is still below the minimum. Lasts 5 years.
  • Wall insulation: written expert advice that it would damage the building. Lasts 5 years.
  • Consent: proof that the tenant, lender, freeholder or planning refused consent. Lasts 5 years, or until the tenancy ends if the tenant refused.
  • Devaluation: a RICS surveyor's report showing the works would cut the value by more than 5%. Lasts 5 years.
  • New landlord: you became the landlord recently. Lasts 6 months.

MEES compliance: penalties for letting below the minimum

Local authority Trading Standards (weights and measures) enforce MEES. They can serve a compliance notice up to 12 months after a breach.

  • Letting below the minimum for less than 3 months: up to £5,000 or 10% of rateable value, whichever is higher, capped at £50,000
  • Letting below the minimum for 3 months or more: up to £10,000 or 20% of rateable value, whichever is higher, capped at £150,000
  • False or misleading information on the exemptions register, or ignoring a compliance notice: up to £5,000
  • No valid EPC when selling or letting: £500 to £5,000, based on rateable value

Landlords in breach can also be named on the public register.

What to do now

  1. Check the EPC. Find the current rating and expiry date on the EPC register. An old EPC often uses default values, so the true rating may be better or worse.
  2. Check the floor area. Over 1,000 m², plan for B. Under 1,000 m², make sure you're at E or better.
  3. Line up the timing. Lease breaks, renewals, voids, fit-outs and plant replacement are the cheapest time to upgrade.
  4. Model before you spend. Our EPC B upgrade plan shows the lowest-cost route, what each step costs and whether it pays back.
  5. Keep the evidence. If the works won't pay back in 7 years, the plan gives you the payback evidence for the exemption.

Letting an F or G building now? Read our guide on MEES for F and G rated commercial buildings. More on the 2031 target: EPC B by 2031: what commercial landlords need to know.

Free quote and evaluation. Send us your floor plans and current EPC by email or WhatsApp. We'll review your building and come back to you with a quote and turnaround time.

Building Regulations and council requirements

Energy upgrades are building work, and most must comply with Part L of the Building Regulations (conservation of fuel and power).

  • Replacement windows, insulation, heating, cooling and lighting must meet minimum efficiency standards.
  • In buildings over 1,000 m², extensions or new and enlarged building services can trigger a duty to make further energy improvements.
  • External changes such as solar panels, heat pump units, external wall insulation and new windows may need planning permission, particularly in conservation areas and for listed buildings.

We identify what approvals your project needs, so there are no surprises once work starts.

Questions we get asked

Does my building need to reach EPC B?
If it is a rented commercial building over 1,000 m², the government's confirmed policy is EPC B by 2031. Smaller buildings currently need EPC E.

Is EPC B by 2031 already law?
Not yet. It was confirmed as government policy in June 2026 and still requires legislation. Starting early gives you time to plan works around lease events.

Can I get a MEES exemption for a commercial property?
Yes, if an upgrade won't pay back within seven years. That test stays under the 2031 policy. We prepare the payback evidence, and you register the exemption on the PRS Exemptions Register. Most exemptions last five years.

Who is responsible, the landlord or the tenant?
The landlord is responsible for meeting MEES. The lease decides who pays for the works and how access is arranged. A tenant who sublets becomes a landlord under the rules.

Do I need a new EPC after the works?
Yes. Once the upgrades are installed, we lodge a new certificate to confirm the improved rating.

How much does an EPC B upgrade plan cost?
From £700+VAT. We run two sets of SBEM calculations, the current rating and the upgraded one, and put the results into the plan. Turnaround is 5 working days once we have everything.

Do you do EPC B plans for offices in London?
Yes. We're based in London and do EPC B plans for offices and other commercial buildings across London and the rest of England and Wales. Send the floor plans and the current EPC for a free quote.

We work out U-values for the existing and upgraded walls, roofs and floors. See U-value calculations.

Send us your files and plans for a free quote, by email or WhatsApp.

Guides: EPC B by 2031: what commercial landlords need to know and letting a commercial building with an F or G EPC

More guides: how long a commercial EPC lasts and commercial EPC levels 3, 4 and 5.

Want the EPC B plan to line up with net zero? See our decarbonisation feasibility studies.

Related: Decarbonisation feasibility studies, SBEM calculations, commercial EPC, TM44 inspections and DECs. Planning wider upgrades? See energy assessments for retrofit projects. Adding solar panels? See solar PV to reach EPC B. Bidding for public sector work? See Carbon Reduction Plans (PPN 006).

This page is general guidance and not legal advice. Last updated 15 November 2026.

Illustration of LED lighting in a commercial building, a common upgrade to improve a commercial EPC rating

How to improve a commercial EPC rating

Energy consultant reviewing renewable energy project data and schematics on tablet in bright office environment

Renewables

A commercial EPC rating is based on the building's calculated carbon emissions, so renewable and low-carbon technologies can lift it significantly.

Solar PV replaces grid electricity with power generated on site. It suits large, unshaded roofs such as warehouses, industrial units and retail parks.
Heat pumps replacing gas boilers or older electric heating often give the largest single improvement.

Loft insulation between timber joists, seen during a building survey

Fabric upgrades

A building that loses less heat needs less energy to run, and the EPC calculation reflects that. Upgrading the fabric lowers heating and cooling demand for the life of the building.

Roof insulation is usually the most cost-effective fabric upgrade, especially on warehouses, industrial units and older flat-roofed offices.
Wall insulation, whether cavity, internal or external, cuts heat loss in older buildings with solid or unfilled walls.
Replacement windows with modern double or triple glazing reduce heat loss, and solar control glass lowers cooling demand in heavily glazed offices.
Fabric upgrades cost least when timed with a refurbishment or re-roofing. 

Heating timer and pump control panel in a commercial plant room

Lighting, heating and cooling

Lighting, heating, cooling and ventilation account for most of the energy in a commercial building's EPC calculation. Upgrading them is often the fastest and lowest-cost way to raise the rating.

LED lighting replacing fluorescent or halogen fittings is usually the quickest win, with a short payback in offices, retail and warehouses.
Lighting controls such as occupancy sensors and daylight dimming improve the rating further at little extra cost.
Heating and cooling upgrades, replacing old boilers, chillers and air conditioning with high-efficiency systems, often deliver the largest single improvement.
Ventilation with heat recovery and variable speed fans cuts the energy used to move and condition air.
These upgrades cost least when timed with a fit-out or plant replacement

Start Today

Send us the floor plans and the current EPC by email or WhatsApp. We'll come back with a free quote and turnaround time.