Recent Projects
SAP calculations, EPCs, overheating assessments and on-site testing we have carried out recently. Client names and addresses are left out.
Recent Projects
A selection of our jobs since January 2026, newest first. We keep every project on this page, so you can see the range of work we do: SAP calculations and EPCs, SBEM, overheating, water calculations, energy statements, and air, sound and ventilation testing. Client names and addresses are left out.
September 2026: Nine new flats, Tunbridge Wells, Kent
Design-stage SAP calculations for nine new flats of 39 to 73 m², all with electric heating, ready for building control before work starts.
September 2026: Five-flat conversion, Whetstone, north London
As-built SAP calculations and EPCs for five flats of 51 to 66 m². All five rated C (69 to 73), with the EPCs lodged for completion.
September 2026: Six new apartments, Charlton, south-east London
Design-stage SAP calculations for six apartments of 60 to 107 m², heated by gas combination boilers, for building control approval.
September 2026: Conversion to five flats, Southampton city centre
Air tightness and sound testing before completion. All five air tests passed first time, at 3.15 to 7.77 m³/(h·m²) against a target of 8. All four airborne sound tests passed, at 45 to 56 dB against a minimum of 43 dB, including the two between the commercial unit and the flats.
August 2026: Conversion to three flats, Guildford, Surrey
As-built SAP calculations for building control on three flats of 57 to 87 m². All three rated C (72 to 75).
August 2026: Three new terraced houses, Slough
Part O overheating assessment by the simplified method. The design passed, so no dynamic model was needed.
July 2026: Conversion to four flats, Southall, west London
As-built SAP calculations using the measured air test results of 4.0 to 4.83 m³/(h·m²). The four flats rated 75 to 82 (C and B).
July 2026: Two-flat conversion, Hayes, west London
As-built SAP calculations for two flats of 52 and 123 m². Rated B (81) and C (77).
July 2026: Office building, Bracknell, Berkshire
SBEM model and commercial EPC for an air-conditioned office building. Rated C (72).
July 2026: Barn conversion, Chorleywood, Hertfordshire
As-built SAP calculation and EPC for a barn converted into a 268 m² home.
June 2026: House conversion, Romford, Essex
As-built SAP calculation for a 192 m² home. Rated A (100).
June 2026: Flat conversion, Holloway, north London
As-built SAP calculation for a 73 m² flat. Rated B (87).
June 2026: Conversion, Gillingham, Kent
As-built SAP calculation for a 113 m² home. Rated C (75).
May 2026: New home, near Bicester, Oxfordshire
As-built SAP calculation and EPC. Rated A (93), with carbon emissions 71% below the Part L target.
April 2026: Five new homes, Croydon, south London
Design-stage SAP calculations for five new homes. All five rated B (81 to 86), with carbon emissions below the Part L target on every home.
March 2026: Three new homes, Potters Bar, Hertfordshire
Design-stage SAP calculations for three new homes. All three rated B (87), with carbon emissions about half the Part L target.
February 2026: Four-flat conversion, Tooting, south London
As-built SAP calculations for four flats of 40 to 93 m². Rated 79 to 81 (C and B).
February 2026: Care home, Welwyn, Hertfordshire
Commercial EPC for a 3,077 m² residential care home. Rated B.
January 2026: New flat, Wimbledon, south-west London
Design-stage SAP calculation for a new flat. Rated B (84), with carbon emissions 38% below the Part L target.
January 2026: New home, Ilford, Essex
As-built SAP calculation and EPC for a new home. Rated C (80), passing the Part L carbon target.
January 2026: Two new flats, Cricklewood, north-west London
Part G water calculations for two flats: 102.1 litres per person per day, inside both the 125 litre limit and the 110 litre optional requirement.
Have a similar project?
We have more than 17 years of experience and have completed more than 8,500 assessments. Send us your drawings and we will tell you what your scheme needs, with a quote and a turnaround time.
Our services: new dwellings, overheating, commercial buildings, air, sound and ventilation testing, retrofit projects and the latest industry updates.
Email your drawings or WhatsApp us for a quote.
Send Us Your Drawings
Have a similar project? Send us your drawings and we will come back with a price and a turnaround time.
