Energy Assessments for Retrofit Projects

EPCs, SAP and SBEM, U-values, condensation risk, PSI values, and air and ventilation testing for retrofit projects on homes and commercial buildings.
Illustration of a brick terraced house being retrofitted with wall and loft insulation, new windows and a heat pump

Energy Assessments for Retrofit Projects

Insulation, new windows, heat pumps, solar PV, better ventilation and controls. Every retrofit needs a clear starting point, a plan, the right people on the job and proof of what the work achieved.

We provide the lot. The PAS 2035 roles, from retrofit assessment and coordination through to design, installation and evaluation, through our TrustMark-registered, PAS 2035 accredited partner. And the EPCs, SAP and SBEM, U-values, condensation risk, PSI values and air and ventilation tests from our own team, with more than 17 years of experience and more than 8,500 assessments. One quote, one point of contact, nationwide.

What we do on retrofit jobs

  • EPCs before and after the work. The before EPC shows where the building stands and which measures move the rating most. The after EPC records the result. SAP calculations and EPCs for homes, commercial EPCs for other buildings.
  • SAP and SBEM calculations. Full calculations for building control, with the options modelled before work starts. SAP from £100+VAT, SBEM from £400+VAT.
  • U-value calculations. Evidence that the new wall, floor and roof build-ups meet Part L. U-value calculations.
  • Condensation risk analysis. Interstitial condensation checked to BS EN ISO 13788, following BS 5250:2021. This matters most on solid walls with internal insulation. Condensation risk analysis.
  • PSI values and thermal bridging. 2D junction models to BR 497, with the temperature factor (fRsi) checked for mould risk at window reveals, floor edges and wall junctions. PSI value calculations and thermal bridging calculations.
  • EPC B upgrade plans. For commercial landlords: which measures, what each does to the rating, and in what order. From £700+VAT. EPC B upgrade plans.
  • Air tightness testing. Shows how leaky the building is before and after the work. Often needed on conversions. Air tightness testing.
  • Ventilation testing. Extract fan and system flow rates measured against Part F. Ventilation testing.
  • Sound testing for conversions. Sound insulation between new flats. Sound insulation testing.
  • Air conditioning and DECs. We provide TM44 inspections, and DECs for public buildings through a trusted partner (DECs).

U-values, condensation risk and PSI values are priced together when booked with each other or with the SAP or SBEM. Air, sound and ventilation tests cost less booked together.

PAS 2035 retrofit: all six roles, one contact

Funded domestic retrofit, and a growing number of private jobs, follow PAS 2035. It needs six roles. We provide all six through our TrustMark-registered, PAS 2035 accredited partner. You deal with us, and we quote and invoice for the whole job.

  • Retrofit advisor: talks you through the options for the home and what each would mean, before anything is decided.
  • Retrofit assessor: surveys the home (EPC data, how it is used, its condition, ventilation and any heritage value) and lodges the retrofit assessment.
  • Retrofit coordinator: runs the project from start to finish, sets the risk path and the medium-term improvement plan, and signs off PAS 2035 compliance.
  • Retrofit designer: chooses the measures and writes the design and specification.
  • Retrofit installer: fits the measures to PAS 2030, then tests and commissions them.
  • Retrofit evaluator: checks after the work that the measures are doing what they should.

Alongside them, our own team supplies the calculations and tests the project needs:

  • For the design: U-values for each build-up, condensation risk on the walls being insulated, and PSI values and fRsi at the junctions where mould tends to start.
  • For the airtightness strategy: air tightness testing before and after, and ventilation flow rates once the work is done.
  • For building control and the client: the SAP or SBEM, and the EPC after the work.

Need just one role, such as a retrofit assessment or a coordinator for your own installer? That's fine too.

Already have a retrofit assessment?

Send it to us. The assessor's report already holds most of what we need: the EPC data, the construction, the heating and hot water, and the ventilation survey. The condition report shows where damp, condensation or mould has been found. We use that with your drawings and build-ups, so there's no need to start again. If you don't have one yet, we provide it.

Why ventilation and moisture need checking

Approved Document F says energy efficiency work must not make ventilation worse, and the building should still meet the minimum standard afterwards. Insulation, new windows and draught-proofing cut air leakage, so ventilation that worked before can fall short.

The result is condensation and mould, usually in corners, at floor edges and around window reveals. That is where junction detail matters. We check those junctions for surface condensation risk with the temperature factor (fRsi), and the walls for interstitial condensation. After the work, an air test and fan flow measurements show whether the ventilation is still enough.

Funded schemes

The Great British Insulation Scheme closed on 31 March 2026. ECO4 runs to 31 December 2026 to finish work already under way. Grant-funded work such as the Warm Homes Local Grant still follows PAS 2035, with a retrofit coordinator and TrustMark-registered installers.

We provide the coordinator and the rest of the PAS 2035 team for funded and private work. Eligibility for a grant is decided by the scheme, so check with your council or scheme provider first.

Why landlords are looking at retrofit now

Privately rented homes in England and Wales must reach EPC C, or its equivalent under the new EPC metrics, by 1 October 2030. Commercial landlords should read our EPC B upgrade plans page. Sources for both are on our industry updates page.

What we need from you

  • The address, property type and rough age, and whether the work is grant-funded.
  • Floor plans, and photos of what is there now: walls, roof, windows, heating and hot water.
  • The planned changes, with the build-ups for any new insulation.
  • The retrofit assessment and condition report, if you have them.
  • For commercial buildings: floor area and use.

Turnaround

  • SAP calculations: 3 working days once we have everything.
  • SBEM and commercial EPCs: 3 working days for small buildings, 5 for larger ones.
  • U-values, condensation risk, PSI values and EPC B plans: 5 working days.
  • Air, sound and ventilation tests: report within 5 working days of the test.
  • PAS 2035 roles: timed per project; we give you the timescale with the quote.

Questions we get asked

Do you do PAS 2035 retrofit assessments? Yes. We provide retrofit assessments, and the other PAS 2035 roles, through our TrustMark-registered, PAS 2035 accredited partner. The EPCs, calculations and tests come from our own team.

Can you run the whole retrofit for us? Yes. Advisor, assessor, coordinator, designer, installer and evaluator, plus the EPCs and tests, under one quote. Or just the roles you need.

Can you work from our retrofit assessment report? Yes. Send it with the drawings and build-ups. It saves time and keeps everyone working from the same data.

Do I need an EPC before starting? Not always, but it is the best starting point and shows which measures matter most.

Will insulation make my home damp? It can if the walls, junctions and ventilation aren't looked at. A condensation risk assessment before the work, and air and fan flow tests after, cover it.

Is there still ECO funding? ECO4 ends on 31 December 2026 and GBIS has already closed. Ask your retrofit coordinator or local council about current grants.

Can the air and ventilation tests be booked together? Yes. It costs less than booking them separately.

More: Decarbonisation feasibility studies, SAP calculations and EPCs, U-value calculations, condensation risk analysis, PSI value calculations, air, sound and ventilation testing, EPC B upgrade plans, solar PV for SAP and SBEM, case studies, industry updates

Guide: SAP calculations for extensions.

Email your drawings or WhatsApp us for a free quote.

Illustration of the five PAS 2035 retrofit roles, with energy calculations and test reports feeding the designer and coordinator

Send Us Your Drawings

Planning a retrofit? Send us your plans and what you want to change. We will tell you which assessments and tests you need, with a free quote and a turnaround time.