Thermal Bridging Calculations, London and Nationwide

We work out the heat lost at every junction in your building and put it straight into the SAP or SBEM. Calculated values where they pay, defaults where they don’t, and a mould check on every detail.
Illustration of a house section with heat escaping at the junctions between walls, floors, roof and a window

Thermal bridging calculations for Part L, SAP and SBEM

A thermal bridge (or cold bridge) is where heat finds a way round the insulation: where the wall meets the floor, at the eaves, around windows and doors, at party walls and balconies. Junctions can be up to 30% of a new home's heat loss, so they can pass or fail a SAP on their own.

A thermal bridging calculation covers the whole building, not one detail. We list every junction off your drawings, choose the best route for each one, model the ones that matter as PSI values, check the mould risk, and work out the y-value that goes into your SAP or SBEM.

Timber studs, rafters and wall ties are repeating bridges and already sit in the U-value. This page is about the junctions.

The four routes for each junction

Approved Document L 2021 gives four ways to account for a junction (checked 15 November 2026):

  • Values calculated by a competent person to BR 497 (2016 edition), with temperature factors to BRE IP 1/06.
  • Details from a reputable independent database of assessed junctions.
  • The default values in SAP Table K1. These can be mixed with calculated values.
  • A blanket default y-value of 0.20 W/m²K.

The old Accredited Construction Details can no longer be used, and LABC says its Registered Construction Details are not for the 2021 Approved Document L in England either. Check where your manufacturer's values came from before they go in the SAP.

The defaults were made more pessimistic in SAP 10.2. They are the easy option and often the reason a design fails or ends up with more PV than it needs.

How the y-value is worked out

Each junction's PSI value is multiplied by its length. Add them all up, plus any point bridges such as steel brackets, and you get the heat loss through thermal bridges. Divide that by the exposed area of the building and you get the y-value.

We measure every junction length off your plans, sections and elevations for each dwelling or building type, so nothing is guessed and nothing is counted twice.

When defaults are enough, and when they aren't

Straight answer: if your design passes comfortably on Table K1 defaults, you may not need calculated values. Calculated values pay for themselves when:

  • The SAP or SBEM fails, or only passes with extra insulation or more PV.
  • It's a block of flats or a terrace: the same junctions repeat across every unit, so one set of calculations works for all of them.
  • The build is timber frame, SIPs, steel frame, ICF or external wall insulation, where the defaults are furthest from reality.
  • There are balconies, steel beams or large glazed areas.
  • You're aiming above the minimum EPC or getting ready for the Future Homes Standard.

Flats and multi-unit schemes

On flats the junction count stays the same however many units there are: ground floor, party floors, balconies, roof, window details. That's why we price by the number of different junctions, not the number of homes. One model of a party floor junction can cover every flat in the block.

Commercial buildings (SBEM)

SBEM counts thermal bridging too and uses pessimistic defaults for each junction type unless calculated values are entered. On steel frame and heavily glazed buildings those defaults can hold the BRUKL back. We model the main junctions and run the SBEM in-house, so you see the effect straight away.

Extensions, conversions and retrofit

Most extensions meet Part L on U-values alone and don't need a thermal bridging calculation. It matters when the extension relies on a whole-house SAP comparison, where the junctions go into both SAPs. See SAP calculations for extensions.

On conversions and retrofit the bigger issue is mould. Internal wall insulation stops at every floor, party wall and partition that meets the outside wall. Those strips stay cold, and that's where condensation and mould turn up after the work is done. We model those junctions and tell you where the insulation needs to return or where a thermal break is worth it.

Mould risk at junctions

A junction can have an acceptable heat loss and still grow mould. We check the inside surface temperature factor (fRsi) of every modelled junction against BRE IP 1/06: at least 0.75 for homes, residential buildings and schools. Where a detail fails, we say what to change. For walls and roofs between the junctions, see condensation risk analysis.

Cutting thermal bridging at design stage

Most junctions are fixed on the drawing, not with thicker insulation:

  • Keep the insulation line unbroken from wall to floor and wall to roof.
  • Use thermally broken lintels and insulated cavity closers.
  • Line the window frame up with the insulation.
  • Use a low-conductivity block or an insulation strip at the base of the wall.
  • Use thermal breaks at balconies and steel connections.

We tell you which change helps most and what it does to the result.

What you get

  • A junction schedule for each dwelling or building type: SAP junction reference, length and the route used for each.
  • Calculated PSI values and fRsi for every modelled junction, with a pass or fail on mould risk.
  • The y-value, entered in the SAP or SBEM (or ready for your assessor).
  • Marked-up details showing what has to be built, so the site photos for the as-built BREL match the SAP.
  • Advice on any junction that is costing you, and the cheapest fix.

What we need from you

  • Plans, sections and elevations.
  • Junction details (ground floor, eaves, verge, party walls and floors, window head, sill and jamb, balconies).
  • Wall, floor and roof build-ups with products and thicknesses.
  • Window and door frame details, and where the frame sits in the wall.

Don't have junction details yet? Send what you have and we'll tell you which ones matter.

Price and turnaround

Priced by the number of different junctions, not the number of homes. Send the details for a free quote.

Turnaround: 5 working days once we have everything we need. Booking the SAP or SBEM, U-values or condensation risk with us at the same time? We price them together.

Thermal bridging and the Future Homes Standard

The new Part L applies to applications from 24 March 2027, with SAP 10.3 as the approved method for now. Fabric targets get tighter, so junctions matter more, not less. Getting them right on today's schemes saves a redesign later. See Home Energy Model. (Checked 15 November 2026.)

Our experience

More than 17 years in energy assessment and more than 4,000 SAP calculations. One team for the junctions and the SAP. See our case studies, including PSI values and thermal bridging for a new timber frame house in Tokers Green, Reading.

We are members of Elmhurst's Psi-Value Competency Scheme.

Questions we get asked

Do I need thermal bridging calculations for building control?
Every new dwelling's SAP has to account for thermal bridging, but it can use defaults. Calculated values are needed when the defaults make the design fail, or pass only at extra cost.

What is a y-value?
The heat lost through all the junctions in a building, divided by its exposed area, in W/m²K. It goes straight into the SAP. The lower it is, the better.

Is the default y-value of 0.20 good enough?
Sometimes, on a simple design that passes easily. It's set high on purpose, so on most new builds it costs you insulation or PV you wouldn't otherwise need.

Can I still use Accredited Construction Details?
No. They can't be used since the 2021 Part L. Use calculated values, an independent database of assessed details, SAP Table K1 defaults or the 0.20 default y-value.

Does an extension need a thermal bridging calculation?
Usually not, if it meets the Part L U-values. It can help when the extension uses a whole-house SAP comparison to show compliance.

Can thermal bridging cause mould?
Yes. A poor junction leaves a cold strip on the inside surface where condensation forms. Our fRsi check shows whether a detail is at risk before it's built.

Related: PSI value calculations, U-value calculations, condensation risk analysis, SAP calculations and EPCs, SBEM and BRUKL, new dwellings, retrofit and Home Energy Model.

Email your drawings or WhatsApp us for a free quote.

Illustration of a house section and plan showing where thermal bridges occur, marked with SAP junction codes

Send Us Your Drawings

Send us your junction details and build-ups by email or WhatsApp for a free quote.