SAP Calculations for Conversions: Offices, Barns and Houses Into Flats
A home made by a change of use isn't a new build in Part L terms. What building control expects, and how to get the existing walls through.
SAP Calculations for Conversions: Offices, Barns and Houses Into Flats
Turning an office, a barn or a large house into flats is a material change of use. Building control will want SAP calculations, and each new flat needs an EPC at the end. The rules are not the same as for a new build, and that is where most conversion jobs go wrong.
Which conversions count
Regulation 5 of the Building Regulations 2010 lists the changes of use that bring a building under the regulations. The ones we see most on residential jobs are:
- A building used as a dwelling where it was not before: an office, shop, barn or warehouse turned into homes.
- A building that now contains a flat where it did not before: a house split into flats.
- A building with more or fewer dwellings than before: flats added, split or merged.
Regulation 6 says which requirements apply. Part L applies in every case. So do Part F ventilation and the hot water rules in Part G.
Not a new build in Part L terms
The new-build emission targets in regulation 26 apply where a building is erected. A home created by a change of use is assessed differently. The focus is the fabric you keep, the fabric you add and the services you fit:
- New and replacement elements meet the limits in Table 4.2 of Approved Document L Volume 1: walls 0.18, floors 0.18 and roofs 0.15 W/m²K; windows 1.4 W/m²K or Window Energy Rating band B; rooflights 2.2 W/m²K; doors 1.4 W/m²K.
- Retained elements worse than the threshold in Table 4.3 are upgraded. The thresholds are 0.35 W/m²K for roofs and 0.70 for walls and floors. The upgrade targets are 0.16 for roofs, 0.30 for walls insulated internally or externally, 0.55 for cavity fill and 0.25 for floors.
- Heating, hot water and controls meet the minimum standards in the Approved Document. We check these in the SAP.
The new Part L starts on 24 March 2027. Jobs with a building notice or full plans in before that date stay on the 2021 rules if work starts before 24 March 2028. We work to whichever edition applies to your job.
When an existing wall can't reach 0.30
Not every retained wall can reach 0.30 W/m²K. Where the full figure is not technically or functionally feasible, or would not pay back within 15 years, the element should reach the lowest U-value that is feasible and does pay back within 15 years. Generally an upgraded element should be no worse than 0.70 W/m²K. A lesser standard may also be accepted where the insulation would cut the floor area of the room by more than 5%.
This is where a conversion is won or lost. Internal insulation on a solid wall changes how moisture moves through it, so check the condensation risk before fixing the build-up. We work out the U-value of the existing construction, the realistic upgrade and whether it is safe.
What else applies to a conversion
- Sound (Part E). Walls and floors between flats formed by a change of use need at least 43 dB airborne and no more than 64 dB impact. A new build needs 45 and 62. Sound testing before completion still applies.
- Water (Part G). A building used as a dwelling for the first time, or one that now contains a flat, needs the water efficiency calculation: 125 litres per person per day, or 110 where the planning permission sets it.
- Overheating (Part O). It does not apply. The government's Part O FAQ says so directly. A planning condition or an energy statement can still ask for an overheating check, so read the decision notice.
- Air and ventilation testing. In England the pressure testing rule in regulation 43 is tied to the erection of a building. The ventilation testing rule in regulation 42 applies where building work creates a new dwelling. Ask building control at the start which tests they want to see.
The EPC at the end
Regulation 7A of the Energy Performance of Buildings Regulations 2012 covers a building modified to have more or fewer parts for separate use, where the work includes new or extended heating, hot water, air conditioning or mechanical ventilation. The person carrying out the work gives the owner an EPC and the local authority notice, no later than five days after completion. In practice each flat gets its own EPC from the as-built SAP.
What we need from you
- Existing and proposed floor plans, elevations and sections
- Build-ups for the existing walls, floors and roof, or the age of the building if they are not known
- What you plan to keep, replace and insulate
- Window, door and rooflight specification
- Heating, hot water and ventilation specification
- The planning decision notice, for any energy, water or overheating condition
Need the U-values or a condensation check too? We can price them together with the SAP.
Questions we get asked
Does a conversion have to meet the same SAP targets as a new build? No. The new-build targets apply where a building is erected. A conversion has to meet the limits for new and upgraded elements, and the SAP produces the EPC for each flat.
The existing walls can't reach 0.30. Is that a fail? Not necessarily. Approved Document L allows a lesser standard where the full upgrade is not feasible or doesn't pay back within 15 years. We show what is achievable and why.
How much does a SAP calculation for a conversion cost? From £100+VAT per home, including U-value calculations and the EPC. Schemes with several flats are priced per project. Turnaround is 3 working days once we have everything we need.
More: SAP calculations and EPCs, U-value calculations, condensation risk analysis, Part G water efficiency, sound insulation testing, and our guides to SAP calculations for extensions, design-stage and as-built SAP and Part G water: 125 or 110 litres.
Email your drawings or WhatsApp us for a quote.
Send Us Your Drawings
Send us the existing and proposed drawings and the build-ups, and we will tell you what needs upgrading, with a free quote.