TM52 or TM59: Which Overheating Assessment Do You Need?

TM59 for homes, TM52 for non-domestic buildings, and both for mixed-use schemes. Here is how to tell which your project needs.
Roof terrace with a glass balustrade beside a new brick apartment building with full-height glazing

TM52 or TM59: Which Overheating Assessment Do You Need?

TM52 and TM59 are both CIBSE dynamic overheating methods: a thermal model of the building, run hour by hour through a warm summer. The difference is who uses the rooms. TM59 is for homes and anywhere people sleep. TM52 is for offices, schools, shops and other non-domestic spaces. Many schemes need both, and we run them in the same model.

The short answer

  • TM59 for new houses, flats, care homes and student accommodation, and the corridors that serve them. It is the dynamic route to Part O. From £500+VAT.
  • TM52 for non-domestic buildings and the non-residential parts of mixed-use schemes, when planning, BREEAM or the client asks for an overheating assessment. Priced per building.
  • Both for mixed-use schemes, such as flats over shops or offices.

TM59: homes and rooms where people sleep

Part O of the Building Regulations covers new residential buildings only. Approved Document O counts houses and flats, care homes and other institutions where people sleep, and student accommodation and halls of residence as residential. Hotel rooms are left out.

There are two ways to show Part O compliance: the simplified method or a dynamic model. Approved Document O names CIBSE TM59 as the dynamic method, and building control expects a report showing the building passes it.

Approved Document O also limits how the TM59 model can be set up:

  • In the day, windows start to open above 22°C and are fully open above 26°C.
  • At night, windows are only modelled fully open on the first floor or above, where they are not easily reached, and when the room is above 23°C at 11pm.
  • Internal blinds and curtains don't count.
  • Where bedroom noise at night would be too high, windows are modelled closed during sleeping hours.

So a ground-floor bedroom on a busy road can't rely on open windows at night.

TM52: offices, schools, shops and other non-domestic buildings

Part O does not apply to non-domestic buildings. So TM52 is not a building control requirement. It is asked for by:

  • Planning in London. The GLA's Energy Assessment Guidance asks major schemes to follow the London Plan cooling hierarchy and report dynamic overheating modelling: TM59 for residential, including care homes and student housing, and TM52 for non-residential.
  • BREEAM, where the assessor asks for overheating modelling for the thermal comfort credits.
  • Schools, which follow the Department for Education's own guidance, BB101.
  • The client, before paying for air conditioning.

TM52 tests each occupied space against adaptive comfort criteria, which allow warmer indoor temperatures in warmer weather. See our TM52 overheating assessment page for the criteria.

Mixed-use schemes need both

Approved Document O applies only to the parts of a mixed-use building that are for residential purposes, and to any corridor that serves the homes. Communal rooms shared by the residents are in scope too.

So in a block of flats over shops, the flats, their corridors and the residents' lounge go into TM59. The shops, offices, gym or café go into TM52 if planning or BREEAM asks for it.

We build one model for the whole scheme and report each space against the right method. It costs less than two models, and the glazing and shading match in both reports.

Where the simplified method fits

For homes only, the Part O simplified method is the cheaper route, from £150+VAT per home. It doesn't work for every design. For example, it can't be used for blocks of flats with significant communal heating pipework running horizontally through the building. We tell you which route your design needs before you pay for either. See Part O simplified method or TM59.

TM52 has no simplified method.

Weather files for London schemes

For London planning, the GLA's guidance asks for the CIBSE TM49 London Design Summer Year files: the 2020s DSY1 year, with the hotter DSY2 and DSY3 years tested as well. The weather station depends on the site: London Weather Centre for central, high-density sites, Heathrow for lower-density urban and suburban sites, and Gatwick for rural and edge-of-town sites. We confirm the files before we start.

Changes coming

Approved Document O (2021 edition) is still the current guidance. In its March 2026 response on the Future Homes and Buildings Standards, the government said it will carry out a full technical review of Approved Document O. No date has been set. Until then the current rules apply.

What we need from you

  • Floor plans, elevations and sections
  • A window and door schedule with sizes and how each one opens
  • Construction build-ups and glazing specification
  • How each non-residential space will be used, and its hours
  • The ventilation strategy, and any acoustic or air quality report

Turnaround is 5 working days once we have everything we need. We work evenings and weekends when a deadline needs it.

Questions we get asked

Is TM52 or TM59 needed for building control? TM59 can be, as the dynamic route to Part O for new homes. TM52 isn't a building control requirement; it is usually asked for at planning or by BREEAM.

Does Part O apply to a conversion or an extension? No. Part O covers new residential buildings. Some councils still ask for an overheating check at planning, and we can provide one.

Our offices will have air conditioning. Do we still need TM52? Not for the cooled spaces. In London you still need to show the cooling hierarchy was followed and why cooling is needed.

Can you do the SAP, SBEM and energy statement too? Yes. We use the same drawings for the SAP, the SBEM calculation and the energy statement, so the figures line up.

More: TM52 overheating assessments, TM59 dynamic overheating assessments, Part O overheating assessments, and our guides to Part O simplified method or TM59, why new homes fail Part O and the London Plan energy hierarchy.

Email your drawings or WhatsApp us for a free quote.

Design team reviewing drawings for a residential overheating assessment

Send Us Your Drawings

Send us your drawings and we'll tell you which assessment your scheme needs, with a free quote and a turnaround time.